Hanger floor and other work.

2nd half of hanger floor has now been cut, more water used to cut down dust so floor is now very wet even though we swept out as much as possible, be aware of slipping on our new ice rink.

Drains from around South side of hanger and cabling for power supply now laid and covered, Beware if you go around there, two deep leaf traps that have been put in near base of gutter downpipe are still open, new covers on order and should be at club Saturday.

Drain across hanger apron will sink a bit in time and contractors have put more stone on the muddy part of apron.

 

Mick L